At 25 kilometers long and at its deepest 70 meters below ground, Tideway is the largest water infrastructure program ever undertaken in the U.K. It has consistently operated within the cost parameters defined over a decade ago and remains on track for full completion ahead of the regulated 2027 date.
The tunnel runs from west to east beneath London and has extended and modernized the city’s 150-year-old sewer system, originally built to serve a population less than half its current size. The new infrastructure reduces untreated discharges into the River Thames by 95% — virtually eliminating the harmful effects of sewage pollution in the Thames through central London.
As of February 2025, the tunnel is fully operational and protecting of the Thames.
The team is now working to thoroughly test the completed system, with the program on track for completion in the coming few months, weather permitting. The new super sewer has a storage capacity of 1.6 million cubic meters — equivalent to 640 Olympic size swimming pools — and will dramatically reduce sewage pollution, creating a cleaner, healthier River Thames and enabling the capital’s sewer system to continue to serve London for at least the next 120 years.
Jacobs has been the program manager for Tideway since 2008, building on our record of delivering major urban wastewater collection and treatment programs and projects globally. The work we are undertaking with Tideway is the kind of complex program that Jacobs enjoys tackling, with multi-site delivery and significant challenges demanding innovation and better ways of working to achieve the best outcomes. It is a great example of where we have been able to provide our full suite of expertise across the program life cycle — from the early planning and feasibility phase, through to design, delivery and handover into operations.
U.S. tons (39M tonnes) – historically, the average yearly amount of untreated sewage discharged into the tidal River Thames.
Providing additional sewer capacity to ensure the city has a sewerage system fit for at least the next 120 years.
Combined with the Lee Tunnel and upgrades to sewage treatment plants, this is the reduction in the volume of sewage pollution spilling into the Thames.