Transforming stormwater management to reduce sewer overflows in New York

Managing an innovative program that incorporates green and gray infrastructure to capture stormwater and improve water quality
Onondaga County
Water

Like many communities with aging combined sewer systems, Onondaga County, New York faced the challenge of managing wet weather events, when excess flows can overwhelm sewer capacity and discharge untreated wastewater into local waterways.  

For nearly two decades, Jacobs has worked with the county to transform how it manages stormwater, combining nature-based solutions with traditional sewer improvements to reduce combined sewer overflows (CSOs), improve water quality and create greener, more resilient urban spaces. In our role as CSO program manager, we’ve led planning, engineering, program delivery and regulatory coordination for one of the nation's pioneering approaches to CSO reduction. 

200+

green infrastructure projects delivered, such as rain gardens, bioswales and permeable pavement

200 million

gallons of stormwater captured annually 

98%

capture of wet weather flows, improving water quality in Onondaga Lake and local waterways

A new approach to wet weather management  

Rather than relying solely on traditional infrastructure using concrete and steel, Onondaga County embraced a more integrated approach, using green infrastructure to capture and manage stormwater closer to where it falls while investing in targeted improvements to its sewer system. 

The nationally recognized program includes more than 200 green infrastructure projects in the City of Syracuse and surrounding area, using vegetation and other natural systems to capture more than 200 million gallons of stormwater annually. Together with investments in traditional treatment and conveyance infrastructure, these improvements have enabled the county to achieve 98% capture of wet weather flows. 

The program brought together a diverse range of solutions, from green roofs, rain gardens and bioswales to permeable pavement, underground infiltration systems and sewer improvements. Integrated into schools, parks, roadways and public facilities, these projects reduce runoff entering the combined sewer system while enhancing urban landscapes and community spaces.

Supporting consenting and funding 

Jacobs supported Onondaga County with negotiating the first federal consent order in the U.S. to incorporate green infrastructure for CSO reduction, establishing a more cost-effective and sustainable long-term control plan for CSOs. 

In 2020, the county achieved a significant regulatory milestone, closing its Federal Amended Consent Judgment after meeting its CSO capture and elimination mandate four years ahead of schedule. The program also achieved the goals of the consent decree under budget, with Jacobs supporting grant and low-interest loan applications that secured more than $300 million in additional funding. 

Building on success for long-term resilience 

The success of the program has established Onondaga County as a national example of integrated stormwater management, demonstrating how green and gray infrastructure can work together to deliver environmental and community benefits. 

Building on these achievements, Jacobs' program management role has expanded to include the county's capacity, management, operations and maintenance (CMOM) program, with a greater focus on using digital tools and data to improve sewer system performance. Through advanced hydraulic modeling and digital water solutions, we’re enabling the county to identify capacity constraints, assess sewer conditions and prioritize infrastructure improvements.