The Harker Energy Enablement project addresses major constraints on the north-south electricity transmission corridor between Scotland and England. Originally built in the 1960s, National Grid’s existing Harker substation in the northwest of England is undergoing a complete rebuild to increase network capacity, support growing renewable generation and reinforce the U.K.’s strategic B6 boundary. The project includes constructing new 400-kilovolt (kV) and 132kV gas-insulated substations (GIS), installing six super‑grid transformers, reconfiguring overhead lines and expanding the existing site to accommodate increased power flows. These upgrades provide additional capacity to integrate future renewable energy connections and support long‑term energy security.
Serving as lead designer for the project, Jacobs delivers full multidisciplinary detailed design across high voltage plant, cabling, civil engineering, architecture and BIM integration. Our digital engineering and 3D modeling workflows strengthen coordination across National Grid, Electricity North West Limited (ENWL), SP Transmission and supply‑chain partners. We’ve optimized foundations, GIS building layouts, cable interfaces and drainage designs to improve constructability and reduce delivery risks. Close collaboration with the contractor enables efficient sequencing, early procurement of long‑lead items and high‑quality delivery outcomes.