Press Release Jan 13, 2015

Jacobs Receives Top Design Award for U.S. Army Facility

Recognized by the U.S. Army Corps of Engineers for Design Excellence

PASADENA, Calif.--(BUSINESS WIRE)-- Jacobs Engineering Group Inc. (NYSE:JEC) announced today that it was honored by the U.S. Army Corps of Engineers with its highest award – the 2014 Chief of Engineers Award of Excellence in Design – for the design of the Mission Training Complex at Fort Bragg located in North Carolina.

Jacobs provided full-service architecture and engineering, including construction administration, for the new 137,000-square-foot Mission Training Complex.

The $28 million facility also received a Leadership in Energy and Environmental Design (LEED®) Gold Certification for New Construction, the 2013 American Institute of Architects (AIA) Northern Virginia Chapter Award of Excellence for Institutional Architecture, and a 2013 AIA DC Chapter Award of Merit.

This combat training complex is a highly functional facility that allows for flexibility and future expansion. It includes modernized classrooms, tactical operations center areas that simulate a combat environment, and work cells with clerestory windows to optimize natural lighting, reduce electricity use and allow natural light to circulate throughout the interior spaces.

In making the announcement, Jacobs Group Vice President Tom McDuffie stated, “We are honored to be recognized by the U.S. Army Corps of Engineers for our work at Fort Bragg and pleased to have the opportunity to contribute to our client’s mission and goals by providing them this facility.”

Jacobs is one of the world's largest and most diverse providers of technical professional and construction services.

Statements made in this release that are not based on historical fact are forward-looking statements. We base these forward-looking statements on management’s current estimates and expectations as well as currently available competitive, financial and economic data. Forward-looking statements, however, are inherently uncertain. There are a variety of factors that could cause business results to differ materially from our forward-looking statements. For a description of some of the factors which may occur that could cause actual results to differ from our forward-looking statements please refer to our 2014 Form 10-K, and in particular the discussions contained under Items 1 - Business, 1A - Risk Factors, 3 - Legal Proceedings, and 7 - Management's Discussion and Analysis of Financial Condition and Results of Operations. We do not undertake to update any forward-looking statements made herein.

Source: Jacobs Engineering Group Inc.

Jacobs Engineering Group Inc.



Michelle Jones, 626-578-6968