Press Release Jun 10, 2008

Jacobs Receives Contract From Estelux for New Polysilicon Plant in Italy

PASADENA, Calif., June 10, 2008 /PRNewswire-FirstCall via COMTEX News Network/ -- Jacobs Engineering Group Inc. (NYSE: JEC) announced today that it received a contract from Estelux to provide engineering, procurement, and construction management (EPCM) services for a new polysilicon manufacturing facility at the existing petrochemical site in Ferrara, Italy.

Estelux is an Italian start-up company with a mission to provide first-class polysilicon, strategic to the entire photovoltaic supply chain. SOLON Group, one of the largest European solar module and photovoltaic systems manufacturers, owns shares in Estelux.

Officials did not disclose contract details.

Polysilicon is purified silicon which is the base of all crystalline silicon photovoltaic cells panels. Estelux's plant production will cover a fundamental step in an integrated complete photovoltaic supply chain that starts with solar grade polysilicon production and ends with the installation of photovoltaic systems.

Jacobs will execute the work from its Milan, Italy, office with support from specialist offices in Greenville, South Carolina, USA; and Mumbai, India. Jacobs Milan office previously completed the preliminary design of the plant.

The new plant will consist of two production buildings, where the polysilicon production process starts with trichlorosilane decomposition to form silicon rods, with a special closed process system; and a finishing building, with laboratories and control rooms, where the rods are crushed, transformed, and packed in contamination controlled environment. The facility will have top-class off-gas treatment plants; a high voltage electrical substation (with transformation and distribution stations for medium and low voltage); a wastewater treatment plant; distillation and fractionation columns; associated utilities; and other infrastructures.

The original and traditional production process called "Siemens process" has been optimized by Estelux Team to achieve a top-class product quality. The plant will reach its full operating capacity in 2010, with a polysilicon production of 4,000 tons per year. The total investment will amount to approx. EUR 360 million.

The facility will be built on an area inside the Ferrara petrochemical site. Environmental impacts will be minimized during the demolition and enabling works prior to construction. Design and construction will maximize energy saving through solar panel utilities usage and recycling technologies, as well as sustainable water and rail transportation solutions and logistics issues. The plant's proximity to the raw material for production limits hazardous materials handling to directly controlled adjacent areas inside the petrochemical site.

Estelux's Chief Executive Officer Domenico Sartore noted, "Estelux is a pioneer in the photovoltaic and sustainability industry and we are glad to have Jacobs as a partner in this investment because we share the same vision and approach of developing innovative solutions."

In making the announcement, Jacobs Group Vice President Robert Matha said, "We are proud to be selected by Estelux for this strategic project. Jacobs is committed to deliver the highest value of service to help them establish a strong market-leader position and satisfy the growing demand for polysilicon-based renewable energy sources."

Jacobs, with over 55,000 employees and revenues exceeding $9.0 billion, provides technical, professional, and construction services globally.

Any statements made in this release that are not based on historical fact are forward-looking statements. Although such statements are based on management's current estimates and expectations, and currently available competitive, financial, and economic data, forward-looking statements are inherently uncertain. We, therefore, caution the reader that there are a variety of factors that could cause business conditions and results to differ materially from what is contained in our forward-looking statements. For a description of some of the factors which may occur that could cause actual results to differ from our forward-looking statements please refer to our 2007 Form 10-K, and in particular the discussions contained under Items 1 - Business, 1A - Risk Factors, 3 - Legal Proceedings, and 7 - Management's Discussion and Analysis of Financial Condition and Results of Operations. We also caution the readers of this release that we do not undertake to update any forward-looking statements made herein.

For additional information contact:

Mary Bloom

626.578.6992

SOURCE Jacobs Engineering Group Inc.

http://www.jacobs.com